
Lady Bell Gold Project
Project Highlights
Near-Mine Location
10km south of the Nepean Nickel Mine, Eastern Goldfields WA
Active Drilling
1,000m extensional drill program completed December 2025, assays pending
Regional Analogue
Structural setting compares to Ghost Crab (1.2Moz) and Gwalia (3.5Moz+)
Near-surface Archaean lode gold, open at depth, with a live drill program testing the extensions
Lady Bell is a structurally controlled gold deposit within Rocktivity’s Nepean Project area, roughly 10km south of the Nepean Nickel Mine and 65km south-east of Kalgoorlie-Boulder in the Eastern Goldfields of Western Australia. Mineralisation sits within a north-northwest trending shear corridor cutting through mafic and ultramafic stratigraphy, hosting free gold and fine-grained pyrite-associated gold in quartz-carbonate veins. The deposit remains open at depth and along plunge, with strong exploration upside inside the same mine infrastructure footprint.
Rocktivity’s Approach
Lady Bell is being advanced as a conventional open-pit operation targeting the near-surface, shallow-dipping portions of the lode system, with standard 5-metre mining benches and electronic-detonation blast design to control dilution. Ore is trucked to a run-of-mine pad for toll treatment through nearby processing infrastructure, avoiding the capital cost and execution risk of a standalone plant and providing a faster path to first gold. Mineralisation is currently confirmed to less than 100 metres below surface and remains open at depth, with a 1,000-metre drill program completed in December 2025 testing those extensions.

An independent structural assessment found Lady Bell shares the same geological architecture as two of Australia’s most significant gold deposits:
Ghost Crab — 1.2Moz in a 200m-wide shoot to 1,500m depth (full scale not understood until four years after discovery)
Gwalia — 3.5Moz+, mined beyond 3,000m depth and still St Barbara’s flagship asset
- Lady Bell has never been drill-tested for depth continuity
- 1,000m extensional drill program completed December 2025, assays pending
- Ore thickness 1–15m true width; open at depth and along plunge
